The FibeAir IP-20A is a highly-flexible aggregation node that delivers multi- Gbps radio capacity at a very large scale. Now available with multicore technology and new radio units, it features high modularity and flexibility, and supports a large number of radio carriers with an exceptionally wide variety of line interfaces via pluggable modules in a. CERAGON IP 10 MANUAL PDF - FibeAir IP features a powerful, integrated Ethernet switch for advanced networking solutions and an optional TDM cross-connect for nodal site. All other user terminations are secure and correctly terminated. Interoperability VerificationConnect customer end equipment to the line interfaces, and verify il operation.
FibeAir IP features a powerful, integrated Ethernet switch for advanced networking solutions and an optional TDM cross-connect for nodal site applications. Tx Range (Manual/ATPC). 20dB dynamic range. System Specifications. FibeAir速 IP Technical. Introducing FibeAir IP FibeAir IP is Ceragon’s next. March Reuven Ginat Describes the FibeAir IPE CLH Compact This manual is intended for use by Ceragon customers, potential customers.
If needed, change the antenna polarization according to the relevant antenna installation guide. No more than m from RFU location.
Save Unit Information 1. Spread grease on the two O-rings supplied with the kit and place them in their locations. The Commissioning Log gathers all relevant information regarding the installed link and contains a checklist of all recommended commissioning tests.
See the third point in the Antenna Mounting section above. Polarization AlignmentPolarization alignment is required to verify that the antenna feeds are adjusted, to ensure that the antenna XPD Cross Polarization Discrimination is achieved. Select Add on the Users section and enter anonymous in the Add user Account window. Polarization adjustment should be done on one antenna only.
The FileZilla Server window will be displayed. With the widest capacity range Mbps for all capacity needs, advanced Adaptive Code Modulation for the best spectrum utilization, and a scalable system that ensures future-proof network expansion, IP is the ideal solution for risk-free migration. Swap the V and H cables and check that the relevant alarm is generated. Following this procedure will ensure proper, long-lasting, and safe operation of the product.
Place the O-ring on the antenna transition. https://renewtopia707.weebly.com/blog/mercedes-ml-320-cdi-2007-user-manual. nanual
Ceragon IP-10 IDU CLI Commands List
Remember me on this computer. Antenna Mounting Mounting pole is of sufficient height to clear local obstructions, such as parapets, window cleaning gantries, and lift housings. All green All green All green All green Line loopback: SW download is based on FTP.
Ceragon Fibeair Rfu C
Statement of ConditionsThe information contained in this document is subject to change without notice. Polaris 1994 sportsman 400 manual download.
This sway brace should not be mounted to the same pole as the antenna, but should be installed directly back to the tower or an alternative point. An adapter is used for the direct mount, as shown in the following illustration. With its Native2 capability for mxnual traffic delivery, and modular architecture for all sites Tail, Chain, Agg3, Agg2this state-of-the-art radio platform offers the best approach to IP migration for advanced networks.
Typically, for an antenna of 1. Only the plugs at the bottom of the antenna, after installation, should be removed. Site RequirementsMust be located indoors. Verify that the management application reports the correct parameters when performing the above.
Ceragon FibeAir-IP10 Manual
Remote mount kit is securely mounted to the pole OK Flexible deragon has no physical damage and connectors OK are sealed All flexible waveguide bolts are secured using washers and OK lock-washers, as appropriate Flexible waveguide is secured to the pole OK 6. Do not attempt to adjust the laser drive current. Acceptance and commissioning should be performed after initial setup is complete. Verify connectivity to IDU ping Verify that there are no errors in the test equipment.
Ceragon IP Manuals CLI Management Installation Licensing Troubleshooting
Where it extends beyond the 45 degree cone of protection of existing lightning conductors, additional lightning protectors should be installed. Maintaining the Commissioning Log is important for tracking your installations, and to provide essential data for Ceragon Networks. Be quiet pure rock user manual.
Pass Pass Pass Pass 7. If the management station is located at a remote site Network Operation Centerverify that the management station can manage the link and receive manyal.
All labeling is complete as per site requirements. Typical labeling requirements include: Copyright by Ceragon Networks Ltd. In addition, since the IDU will be connected to the RFU, when considering a site, it is important to check for current and future obstacles on the roof or tower.
If any part is damaged or missing, contact your local distributor. That s it you are done. The Commissioning Log gathers all relevant information regarding the installed link and contains a checklist of all recommended commissioning tests.
Ceragon Fibeair Ip 10 User Manual GuideCeragon FibeAir-IP10 Manual – [PDF Document]Ceragon Fibeair Ip 10 User Manual Pdf
If the management station is located a t a remote site Network Operation Centerverify that the management station can manage the link and receive traps. The kanual of these plugs is to allow any moisture that forms on the inside of the antenna or radome to drip out and prevent a pool within the antenna. Available management connection Ethernet or dial-up.
TOP 10 Related
Previous post: [ JOGLO ARSITEKTUR RUMAH TRADISIONAL JAWA PDF ]
FibeAir IP features a powerful, integrated Ethernet switch for advanced networking solutions and an optional TDM cross-connect for nodal site applications. Tx Range (Manual/ATPC). 20dB dynamic range. System Specifications. FibeAir速 IP Technical. Introducing FibeAir IP FibeAir IP is Ceragon’s next. March Reuven Ginat Describes the FibeAir IPE CLH Compact This manual is intended for use by Ceragon customers, potential customers.
Lutilisation de commandes ou de rglages ou l’excution de procdures autres que celles spcifies dans les prsentes peut engendrer une exposition dangereuse aux rayonnements.! FibeAir provides a ground for each IDU, via a one-hole mounted lug onto a single-point stud. Machinery health manager 5.7 user manual diagram.
Use of controls, adjustments, or performing procedures other than those specified herein, may result in hazardous radiation exposure. Labeling is specific to each customer.
Ceragon IP Manuals CLI Management Installation Licensing Troubleshooting
Do not attempt to adjust the laser drive current. The Users window will be displayed. Verify SW files stored at C: Extract the file and run the installation setup. The following basic commands are available when you first log in, if you belong to the Operator user. Verify no Ethernet traffic cables or fibers connected. Open the IDU and go to: For access to the site, contact support ceragon. Mahual pole is secure and perpendicular.
Spread grease on the O-ring supplied with the flexible waveguide. Pass Pass Pass Pass 7. For a list of accessories, see Appendix D – Accessories.
Ceragon ip10 user manual. No part of this publication may be reproduced, modified, or distributed without prior written authorization of Ceragon Networks Ltd.
Ceragon FibeAir-IP10 Manual
Ceeagon example, the prompt for a unit located in slot. Machine noise information order – 3. It is the owners responsibility to obtain any and all permits. Configuring the IDUAfter the system is installed and tested, and antenna alignment is performed, the next step is IDU setup and configuration.
All fiber optic patch leads should be routed carefully and efficiently, using conduits to prevent damage to the cables.
arvid :: Ceragon ip 10 manual
Other names mentioned in this publication are owned by their respective holders. For connectors or signals labeled RX, the signals are sent to FibeAir. Insert the new fan tray entirely in its place and tighten the deragon screw. Mounting pole is grounded as per site specifications. Der Laserstrahl ist unsichtbar!! Make sure that the inner pin of the connector does not exceed the edge of the connector.
Ceragon IP-10 IDU CLI Commands List
OAM tools, this first-of-its-kind solution simplifies network design, reduces Ceragon ip10 user manual. Unpack the contents and check for damaged or missing parts.
As shown in the illustration above, the protection panel in the middle provides the ports used to link the two IP units for protection switching when a system fault occurs. Please contact your Ceragon representative for details. To prevent damage, before touching components inside the device, all electrostatic must be discharged from both personnel and tools. The FileZilla Server window will be displayed.
Upon completing the Commissioning Log, send the log to Ceragon support center at support ceragon. See the third point in the Antenna Mounting section above. Power supply grounding should be in accordance with the following illustration: Verify that the application reports the correct parameters when performing the above. Verify connectivity to IDU ping Unpack the contents and check for damaged or missing parts.
This sway brace should not be mounted to the same pole as the antenna, but should be installed directly back to the tower or an alternative point. Some antennas cerragon moisture drain plugs installed at various points around the antenna. Ceragon ip 10 manual.
Most 10 RelatedComments are closed.
|
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |